Solar plant: site data
Solar power plant in Krasne, Berdianskyi Raion, Zaporizhzhia Oblast
Krasne: 1,217 kWh per kWp a year, tilt 36° facing south (PVGIS). Exactly the oblast median (1,212). #71 of 116 in the rayon, #375 of 972 in the oblast.
Berdyansk, the rayon centre, is 59 km away. 126 m above sea level. 48 km away: Pryazovske, the nearest bigger centre, 1,254 — 2.9% less here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 118 km. 9.57 m between rows, pitch 13.44 m (latitude 47.0°).
- Yield of 1 kWp
- 1,217kWh/year
- Tilt
- 36°facing south
- 10 kW
- 12,172kWh/year
- Row pitch
- 13.44m · GCR 0.36
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 1,110 / 460Pa
Ground frame designer
A ground frame for a solar plant: Krasne
The designer opens with this place’s coordinates, latitude 47.0° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 118 km: snow 1,110 Pa, wind 460 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 152 kWh/kWp, December: 33 — 4.6 times less.
November: 56 against 54 in the oblast, 3.7% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 6,086 | 760 | 165 |
| 10 | 12,172 | 1,520 | 330 |
| 15 | 18,258 | 2,280 | 495 |
Example: a 10 kW ground frame
For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.
How these numbers are computed
Nearby
- Iline1 km1,220 kWh/kWp
- Shardau3 km1,220 kWh/kWp
- Tarasivka5 km1,217 kWh/kWp
- Boiove6 km1,217 kWh/kWp
- Oleksandrivka6 km1,221 kWh/kWp
- Rozivka7 km1,214 kWh/kWp
All places: Berdianskyi RaionZaporizhzhia Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.