Solar plant: site data

Solar power plant in Kosykh, Melitopolskyi Raion, Zaporizhzhia Oblast

Kosykh: 1,282 kWh per kWp a year, tilt 36° 2° west of south (PVGIS). 5.8% above the oblast median (1,212). #7 of 215 in the rayon, #20 of 972 in the oblast.

Melitopol, the rayon centre, is 44 km away. 5 m above sea level. 28 km away: Yakymivka, the nearest bigger centre, 1,243 — 3.1% more here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 154 km. 9.23 m between rows, pitch 13.10 m (latitude 46.5°).

Yield of 1 kWp
1,282kWh/year
Tilt
36°2° west of south
10 kW
12,823kWh/year
Row pitch
13.10m · GCR 0.37
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Kosykh

The designer opens with this place’s coordinates, latitude 46.5° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 154 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

46Jan61Feb106Mar130Apr151May149Jun157Jul158Aug132Sep97Oct55Nov39Dec

August: 158 kWh/kWp, December: 39 — 4.1 times less.

January: 46 against 37 in the oblast, 24.3% more.

Kosykh: plants, kWh
kWpA yearAugustDecember
56,412790195
1012,8231,580390
1519,2352,370585

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Melitopolskyi RaionZaporizhzhia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.