Solar plant: site data
Solar power plant in Heorhiivka, Melitopolskyi Raion, Zaporizhzhia Oblast
Heorhiivka: 1,282 kWh per kWp a year, tilt 36° 2° west of south (PVGIS). 5.8% above the oblast median (1,212). #9 of 215 in the rayon, #22 of 972 in the oblast.
Melitopol, the rayon centre, is 29 km away. 11 m above sea level. 11 km away: Pryazovske, the nearest bigger centre, 1,254 — 2.3% more here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 139 km. 9.34 m between rows, pitch 13.21 m (latitude 46.6°).
- Yield of 1 kWp
- 1,282kWh/year
- Tilt
- 36°2° west of south
- 10 kW
- 12,820kWh/year
- Row pitch
- 13.21m · GCR 0.36
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 1,110 / 460Pa
Ground frame designer
A ground frame for a solar plant: Heorhiivka
The designer opens with this place’s coordinates, latitude 46.6° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 139 km: snow 1,110 Pa, wind 460 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 159 kWh/kWp, December: 37 — 4.3 times less.
January: 43 against 37 in the oblast, 16.2% more.
| kWp | A year | August | December |
|---|---|---|---|
| 5 | 6,410 | 795 | 185 |
| 10 | 12,820 | 1,590 | 370 |
| 15 | 19,230 | 2,385 | 555 |
Example: a 10 kW ground frame
For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.
How these numbers are computed
Nearby
- Bilorichanske4 km1,275 kWh/kWp
- Divnynske4 km1,270 kWh/kWp
- Shevchenka6 km1,275 kWh/kWp
- Hamivka6 km1,275 kWh/kWp
- Tavriiske6 km1,275 kWh/kWp
- Petrivka7 km1,275 kWh/kWp
All places: Melitopolskyi RaionZaporizhzhia Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.