Solar power plant in Havrylivka, Melitopolskyi Raion, Zaporizhzhia Oblast

Havrylivka: 1,220 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 0.7% above the oblast median (1,212). #179 of 215 in the rayon, #318 of 972 in the oblast.

Melitopol, the rayon centre, is 57 km away. 72 m above sea level. 17 km away: Vesele, the nearest bigger centre, the same 1,216. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 92 km. 9.60 m between rows, pitch 13.47 m (latitude 47.1°).

Yield of 1 kWp
1,220kWh/year
Tilt
36°2° east of south
10 kW
12,202kWh/year
Row pitch
13.47m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Havrylivka

The designer opens with this place’s coordinates, latitude 47.1° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 92 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

39Jan56Feb101Mar122Apr142May143Jun153Jul152Aug127Sep97Oct55Nov32Dec

July: 153 kWh/kWp, December: 32 — 4.8 times less.

January: 39 against 37 in the oblast, 5.4% more.

Havrylivka: plants, kWh
kWpA yearJulyDecember
56,101765160
1012,2021,530320
1518,3032,295480

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Melitopolskyi RaionZaporizhzhia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.