Solar plant: site data

Solar power plant in Davydivka, Melitopolskyi Raion, Zaporizhzhia Oblast

Davydivka: 1,266 kWh per kWp a year, tilt 36° 1° west of south (PVGIS). 4.4% above the oblast median (1,212). #38 of 215 in the rayon, #64 of 972 in the oblast.

Melitopol, the rayon centre, is 41 km away. 11 m above sea level. 21 km away: Yakymivka, the nearest bigger centre, 1,243 — 1.8% more here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 147 km. 9.27 m between rows, pitch 13.14 m (latitude 46.5°).

Yield of 1 kWp
1,266kWh/year
Tilt
36°1° west of south
10 kW
12,656kWh/year
Row pitch
13.14m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Davydivka

The designer opens with this place’s coordinates, latitude 46.5° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 147 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

43Jan62Feb105Mar127Apr149May146Jun154Jul156Aug131Sep98Oct56Nov38Dec

August: 156 kWh/kWp, December: 38 — 4.1 times less.

December: 38 against 32 in the oblast, 18.8% more.

Davydivka: plants, kWh
kWpA yearAugustDecember
56,328780190
1012,6561,560380
1518,9842,340570

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Melitopolskyi RaionZaporizhzhia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.