Solar plant: site data

Solar power plant in Danylivka, Zaporizkyi Raion, Zaporizhzhia Oblast

Danylivka: 1,193 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 1.6% below the oblast median (1,212). #161 of 286 in the rayon, #717 of 972 in the oblast.

Zaporizhzhya, the rayon centre, is 66 km away. 115 m above sea level. 22 km away: Hulyaypole, the nearest bigger centre, the same 1,193. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 64 km. 10.03 m between rows, pitch 13.90 m (latitude 47.7°).

Yield of 1 kWp
1,193kWh/year
Tilt
36°2° east of south
10 kW
11,926kWh/year
Row pitch
13.90m · GCR 0.34
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Danylivka

The designer opens with this place’s coordinates, latitude 47.7° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 64 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan56Feb96Mar119Apr140May143Jun151Jul151Aug124Sep95Oct52Nov30Dec

July: 151 kWh/kWp, December: 30 — 5.0 times less.

December: 30 against 32 in the oblast, 6.3% less.

Danylivka: plants, kWh
kWpA yearJulyDecember
55,963755150
1011,9261,510300
1517,8892,265450

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Zaporizkyi RaionZaporizhzhia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.