Solar plant: site data

Solar power plant in Chervonodniprovka, Zaporizkyi Raion, Zaporizhzhia Oblast

Chervonodniprovka: 1,225 kWh per kWp a year, tilt 36° facing south (PVGIS). 1.1% above the oblast median (1,212). #17 of 286 in the rayon, #258 of 972 in the oblast.

Zaporizhzhya, the rayon centre, is 33 km away. 48 m above sea level. 27 km away: Vasylivka, the nearest bigger centre, 1,237 — 1.0% less here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 33 km. 9.92 m between rows, pitch 13.79 m (latitude 47.6°).

Yield of 1 kWp
1,225kWh/year
Tilt
36°facing south
10 kW
12,246kWh/year
Row pitch
13.79m · GCR 0.35
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Chervonodniprovka

The designer opens with this place’s coordinates, latitude 47.6° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 33 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

42Jan59Feb98Mar123Apr146May147Jun154Jul154Aug126Sep93Oct51Nov33Dec

July: 154 kWh/kWp, December: 33 — 4.7 times less.

January: 42 against 37 in the oblast, 13.5% more.

Chervonodniprovka: plants, kWh
kWpA yearJulyDecember
56,123770165
1012,2461,540330
1518,3692,310495

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Zaporizkyi RaionZaporizhzhia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.