Solar power plant in Chernihovo-Tokmachansk, Berdianskyi Raion, Zaporizhzhia Oblast
Chernihovo-Tokmachansk: 1,204 kWh per kWp a year, tilt 35° 1° east of south (PVGIS). 0.7% below the oblast median (1,212). #106 of 116 in the rayon, #564 of 972 in the oblast.
Berdyansk, the rayon centre, is 61 km away. 165 m above sea level. 38 km away: Polohy, the nearest bigger centre, the same 1,199. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 113 km. 9.41 m between rows, pitch 13.33 m (latitude 47.1°).
- Yield of 1 kWp
- 1,204kWh/year
- Tilt
- 35°1° east of south
- 10 kW
- 12,036kWh/year
- Row pitch
- 13.33m · GCR 0.36
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 1,110 / 460Pa
Ground frame designer
A ground frame for a solar plant: Chernihovo-Tokmachansk
The designer opens with this place’s coordinates, latitude 47.1° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 113 km: snow 1,110 Pa, wind 460 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 152 kWh/kWp, December: 31 — 4.9 times less.
December: 31 against 32 in the oblast, 3.1% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 6,018 | 760 | 155 |
| 10 | 12,036 | 1,520 | 310 |
| 15 | 18,054 | 2,280 | 465 |
Example: a 10 kW ground frame
For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.
How these numbers are computed
Nearby
- Kotliarivka4 km1,203 kWh/kWp
- Tokmachansk5 km1,205 kWh/kWp
- Prostore5 km1,212 kWh/kWp
- Mohyliany5 km1,201 kWh/kWp
- Chernihivka6 km1,205 kWh/kWp
- Dovhe7 km1,208 kWh/kWp
All places: Berdianskyi RaionZaporizhzhia Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.