Solar power plant in Berezhne, Polohivskyi Raion, Zaporizhzhia Oblast

Berezhne: 1,204 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 0.6% below the oblast median (1,212). #68 of 249 in the rayon, #558 of 972 in the oblast.

Polohy, the rayon centre, is 38 km away. 155 m above sea level. 17 km away: Bilmak, the nearest bigger centre, 1,187 — 1.4% more here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 129 km. 9.69 m between rows, pitch 13.56 m (latitude 47.2°).

Yield of 1 kWp
1,204kWh/year
Tilt
36°1° east of south
10 kW
12,040kWh/year
Row pitch
13.56m · GCR 0.35
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Berezhne

The designer opens with this place’s coordinates, latitude 47.2° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 129 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan57Feb97Mar121Apr140May142Jun150Jul153Aug127Sep97Oct53Nov31Dec

August: 153 kWh/kWp, December: 31 — 4.9 times less.

December: 31 against 32 in the oblast, 3.1% less.

Berezhne: plants, kWh
kWpA yearAugustDecember
56,020765155
1012,0401,530310
1518,0602,295465

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Polohivskyi RaionZaporizhzhia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.