Solar plant: site data

Solar power plant in Abrykosivka, Vasylivskyi Raion, Zaporizhzhia Oblast

Abrykosivka: 1,217 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). Exactly the oblast median (1,212). #72 of 106 in the rayon, #385 of 972 in the oblast.

Vasylivka, the rayon centre, is 17 km away. 83 m above sea level. 17 km away: Vasylivka, the nearest bigger centre, 1,237 — 1.7% less here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 63 km. 9.74 m between rows, pitch 13.61 m (latitude 47.3°).

Yield of 1 kWp
1,217kWh/year
Tilt
36°1° east of south
10 kW
12,168kWh/year
Row pitch
13.61m · GCR 0.35
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Abrykosivka

The designer opens with this place’s coordinates, latitude 47.3° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 63 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan57Feb99Mar121Apr141May145Jun155Jul153Aug127Sep96Oct54Nov32Dec

July: 155 kWh/kWp, December: 32 — 4.8 times less.

July: 155 against 152 in the oblast, 2.0% more.

Abrykosivka: plants, kWh
kWpA yearJulyDecember
56,084775160
1012,1681,550320
1518,2522,325480

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Vasylivskyi RaionZaporizhzhia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.