Solar plant: site data
Solar power plant in Svoboda, Khustskyi Raion, Zakarpattia Oblast
Svoboda: 997 kWh per kWp a year, tilt 37° 8° east of south (PVGIS). 12.6% below the oblast median (1,141). #131 of 145 in the rayon, #587 of 613 in the oblast.
Khust, the rayon centre, is 61 km away. 959 m above sea level — above 500 m the DBN snow and wind are higher. 60 km away: Nadvirna, the nearest bigger centre, 1,085 — 8.1% less here. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 77 km. 10.92 m between rows, pitch 14.74 m (latitude 48.6°).
- Yield of 1 kWp
- 997kWh/year
- Tilt
- 37°8° east of south
- 10 kW
- 9,970kWh/year
- Row pitch
- 14.74m · GCR 0.32
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,410 / 500Pa
Ground frame designer
A ground frame for a solar plant: Svoboda
The designer opens with this place’s coordinates, latitude 48.6° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 77 km: snow 1,410 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 120 kWh/kWp, December: 33 — 3.6 times less.
June: 109 against 133 in the oblast, 18.0% less.
| kWp | A year | August | December |
|---|---|---|---|
| 5 | 4,985 | 600 | 165 |
| 10 | 9,970 | 1,200 | 330 |
| 15 | 14,955 | 1,800 | 495 |
Snow and wind: Івано-Франківськ
Example: a 10 kW ground frame
For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.
How these numbers are computed
Nearby
- Synevyrska Poliana7 km1,025 kWh/kWp
- Zahorb9 km1,024 kWh/kWp
- Berehy9 km996 kWh/kWp
- Torun12 km950 kWh/kWp
- Vyshkiv13 km1,021 kWh/kWp
- Titkivtsi13 km949 kWh/kWp
All places: Khustskyi RaionZakarpattia Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.