Solar plant: site data
Solar power plant in Sofiia, Mukachivskyi Raion, Zakarpattia Oblast
Sofiia: 1,169 kWh per kWp a year, tilt 38° facing south (PVGIS). 2.5% above the oblast median (1,141). #15 of 139 in the rayon, #154 of 613 in the oblast.
Mukachevo, the rayon centre, is 10 km away. 152 m above sea level. 10 km away: Mukachevo, the nearest bigger centre, the same 1,165. Snow and wind from the nearest regional centre in the DBN — Ужгород, 46 km. 10.99 m between rows, pitch 14.76 m (latitude 48.4°).
- Yield of 1 kWp
- 1,169kWh/year
- Tilt
- 38°facing south
- 10 kW
- 11,692kWh/year
- Row pitch
- 14.76m · GCR 0.32
- T_min
- -32 °Cregion IIIB, Transcarpathian
- Snow S₀ / wind W₀
- 1,340 / 370Pa
Ground frame designer
A ground frame for a solar plant: Sofiia
The designer opens with this place’s coordinates, latitude 48.4° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 46 km: snow 1,340 Pa, wind 370 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 142 kWh/kWp, December: 32 — 4.4 times less.
November: 56 against 53 in the oblast, 5.7% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,846 | 710 | 160 |
| 10 | 11,692 | 1,420 | 320 |
| 15 | 17,538 | 2,130 | 480 |
Example: a 10 kW ground frame
For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.
How these numbers are computed
Nearby
- Zubivka1 km1,170 kWh/kWp
- Lalovo2 km1,157 kWh/kWp
- Novoselytsia3 km1,154 kWh/kWp
- Yabluniv3 km1,169 kWh/kWp
- Pistrialovo3 km1,159 kWh/kWp
- Berezynka3 km1,142 kWh/kWp
All places: Mukachivskyi RaionZakarpattia Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.