Solar plant: site data

Solar power plant in Shalanky, Berehivskyi Raion, Zakarpattia Oblast

Shalanky: 1,186 kWh per kWp a year, tilt 38° facing south (PVGIS). 4.0% above the oblast median (1,141). #61 of 105 in the rayon, #81 of 613 in the oblast.

Berehove, the rayon centre, is 18 km away. 119 m above sea level. 18 km away: Berehove, the nearest bigger centre, the same 1,185. Snow and wind from the nearest regional centre in the DBN — Ужгород, 61 km. 10.86 m between rows, pitch 14.63 m (latitude 48.2°).

Yield of 1 kWp
1,186kWh/year
Tilt
38°facing south
10 kW
11,862kWh/year
Row pitch
14.63m · GCR 0.33
T_min
-32 °Cregion IIIB, Transcarpathian
Snow S₀ / wind W₀
1,340 / 370Pa

Ground frame designer

A ground frame for a solar plant: Shalanky

The designer opens with this place’s coordinates, latitude 48.2° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 61 km: snow 1,340 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

39Jan60Feb105Mar125Apr134May137Jun143Jul143Aug117Sep92Oct58Nov34Dec

July: 143 kWh/kWp, December: 34 — 4.2 times less.

December: 34 against 31 in the oblast, 9.7% more.

Shalanky: plants, kWh
kWpA yearJulyDecember
55,931715170
1011,8621,430340
1517,7932,145510

Snow and wind: Ужгород

Example: a 10 kW ground frame

For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Berehivskyi RaionZakarpattia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.