Solar plant: site data
Solar power plant in Nyzhnii Studenyi, Khustskyi Raion, Zakarpattia Oblast
Nyzhnii Studenyi: 1,036 kWh per kWp a year, tilt 37° 12° east of south (PVGIS). 9.2% below the oblast median (1,141). #114 of 145 in the rayon, #553 of 613 in the oblast.
Khust, the rayon centre, is 59 km away. 597 m above sea level — above 500 m the DBN snow and wind are higher. 55 km away: Mukachevo, the nearest bigger centre, 1,165 — 11.1% less here. Snow and wind from the nearest regional centre in the DBN — Ужгород, 79 km. 10.98 m between rows, pitch 14.80 m (latitude 48.7°).
- Yield of 1 kWp
- 1,036kWh/year
- Tilt
- 37°12° east of south
- 10 kW
- 10,361kWh/year
- Row pitch
- 14.80m · GCR 0.32
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,340 / 370Pa
Ground frame designer
A ground frame for a solar plant: Nyzhnii Studenyi
The designer opens with this place’s coordinates, latitude 48.7° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 79 km: snow 1,340 Pa, wind 370 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 126 kWh/kWp, December: 30 — 4.2 times less.
November: 46 against 53 in the oblast, 13.2% less.
| kWp | A year | August | December |
|---|---|---|---|
| 5 | 5,181 | 630 | 150 |
| 10 | 10,361 | 1,260 | 300 |
| 15 | 15,541 | 1,890 | 450 |
Example: a 10 kW ground frame
For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.
How these numbers are computed
Nearby
- Verkhniy Studenyi3 km1,024 kWh/kWp
- Rekity4 km1,013 kWh/kWp
- Roztoka4 km1,039 kWh/kWp
- Liskovets5 km1,016 kWh/kWp
- Izky6 km1,053 kWh/kWp
- Khashchovania7 km1,030 kWh/kWp
All places: Khustskyi RaionZakarpattia Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.