Mykulivtsi: 1,131 kWh per kWp a year, tilt 37° 1° west of south (PVGIS). 0.9% below the oblast median (1,141). #75 of 139 in the rayon, #353 of 613 in the oblast.

Mukachevo, the rayon centre, is 15 km away. 268 m above sea level. 15 km away: Mukachevo, the nearest bigger centre, 1,165 — 2.9% less here. Snow and wind from the nearest regional centre in the DBN — Ужгород, 26 km. 10.87 m between rows, pitch 14.69 m (latitude 48.6°).

Yield of 1 kWp
1,131kWh/year
Tilt
37°1° west of south
10 kW
11,311kWh/year
Row pitch
14.69m · GCR 0.33
T_min
-32 °Cregion IIIB, Transcarpathian
Snow S₀ / wind W₀
1,340 / 370Pa

Ground frame designer

A ground frame for a solar plant: Mykulivtsi

The designer opens with this place’s coordinates, latitude 48.6° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 26 km: snow 1,340 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

40Jan60Feb99Mar117Apr129May133Jun138Jul137Aug111Sep86Oct51Nov29Dec

July: 138 kWh/kWp, December: 29 — 4.8 times less.

December: 29 against 31 in the oblast, 6.5% less.

Mykulivtsi: plants, kWh
kWpA yearJulyDecember
55,656690145
1011,3111,380290
1516,9672,070435

Snow and wind: Ужгород

Example: a 10 kW ground frame

For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Mukachivskyi RaionZakarpattia Oblast: rayons and towns

Free calculators

Sources