Solar plant: site data

Solar power plant in Lukovo, Khustskyi Raion, Zakarpattia Oblast

Lukovo: 1,117 kWh per kWp a year, tilt 37° 1° west of south (PVGIS). 2.1% below the oblast median (1,141). #74 of 145 in the rayon, #386 of 613 in the oblast.

Khust, the rayon centre, is 18 km away. 158 m above sea level. 18 km away: Khust, the nearest bigger centre, 978 — 14.2% more here. Snow and wind from the nearest regional centre in the DBN — Ужгород, 75 km. 10.69 m between rows, pitch 14.51 m (latitude 48.3°).

Yield of 1 kWp
1,117kWh/year
Tilt
37°1° west of south
10 kW
11,174kWh/year
Row pitch
14.51m · GCR 0.33
T_min
-32 °Cregion IIIB, Transcarpathian
Snow S₀ / wind W₀
1,340 / 370Pa

Ground frame designer

A ground frame for a solar plant: Lukovo

The designer opens with this place’s coordinates, latitude 48.3° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 75 km: snow 1,340 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

42Jan59Feb97Mar113Apr125May131Jun137Jul136Aug109Sep86Oct53Nov30Dec

July: 137 kWh/kWp, December: 30 — 4.6 times less.

January: 42 against 39 in the oblast, 7.7% more.

Lukovo: plants, kWh
kWpA yearJulyDecember
55,587685150
1011,1741,370300
1516,7612,055450

Snow and wind: Ужгород

Example: a 10 kW ground frame

For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Khustskyi RaionZakarpattia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.