Solar plant: site data

Solar power plant in Luhy, Rakhivskyi Raion, Zakarpattia Oblast

Luhy: 958 kWh per kWp a year, tilt 34° 24° east of south (PVGIS). 16.1% below the oblast median (1,141). #34 of 36 in the rayon, #603 of 613 in the oblast.

Rakhiv, the rayon centre, is 18 km away. 638 m above sea level — above 500 m the DBN snow and wind are higher. 18 km away: Rakhiv, the nearest bigger centre, 1,068 — 10.3% less here. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 97 km. 9.75 m between rows, pitch 13.72 m (latitude 48.1°).

Yield of 1 kWp
958kWh/year
Tilt
34°24° east of south
10 kW
9,576kWh/year
Row pitch
13.72m · GCR 0.35
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,410 / 500Pa

Ground frame designer

A ground frame for a solar plant: Luhy

The designer opens with this place’s coordinates, latitude 48.1° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 97 km: snow 1,410 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan47Feb81Mar99Apr114May119Jun126Jul125Aug91Sep64Oct35Nov23Dec

July: 126 kWh/kWp, December: 23 — 5.5 times less.

November: 35 against 53 in the oblast, 34.0% less.

Luhy: plants, kWh
kWpA yearJulyDecember
54,788630115
109,5761,260230
1514,3641,890345

Snow and wind: Івано-Франківськ

Example: a 10 kW ground frame

For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Rakhivskyi RaionZakarpattia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.