Solar power plant in Lazy, Mukachivskyi Raion, Zakarpattia Oblast

Lazy: 1,064 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 6.8% below the oblast median (1,141). #122 of 139 in the rayon, #501 of 613 in the oblast.

Mukachevo, the rayon centre, is 49 km away. 539 m above sea level — above 500 m the DBN snow and wind are higher. 49 km away: Mukachevo, the nearest bigger centre, 1,165 — 8.7% less here. Snow and wind from the nearest regional centre in the DBN — Ужгород, 65 km. 10.77 m between rows, pitch 14.64 m (latitude 48.8°).

Yield of 1 kWp
1,064kWh/year
Tilt
36°1° east of south
10 kW
10,637kWh/year
Row pitch
14.64m · GCR 0.33
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,340 / 370Pa

Ground frame designer

A ground frame for a solar plant: Lazy

The designer opens with this place’s coordinates, latitude 48.8° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 65 km: snow 1,340 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

40Jan58Feb93Mar109Apr118May123Jun130Jul131Aug105Sep80Oct46Nov28Dec

August: 131 kWh/kWp, December: 28 — 4.7 times less.

November: 46 against 53 in the oblast, 13.2% less.

Lazy: plants, kWh
kWpA yearAugustDecember
55,319655140
1010,6371,310280
1515,9561,965420

Snow and wind: Ужгород

Example: a 10 kW ground frame

For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Mukachivskyi RaionZakarpattia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.