Solar plant: site data

Solar power plant in Kireshi, Khustskyi Raion, Zakarpattia Oblast

Kireshi: 1,160 kWh per kWp a year, tilt 37° facing south (PVGIS). 1.6% above the oblast median (1,141). #13 of 145 in the rayon, #201 of 613 in the oblast.

Khust, the rayon centre, is 4 km away. 176 m above sea level. 4 km away: Khust, the nearest bigger centre, 978 — 18.5% more here. Snow and wind from the nearest regional centre in the DBN — Ужгород, 91 km. 10.59 m between rows, pitch 14.41 m (latitude 48.2°).

Yield of 1 kWp
1,160kWh/year
Tilt
37°facing south
10 kW
11,598kWh/year
Row pitch
14.41m · GCR 0.33
T_min
-32 °Cregion IIIB, Transcarpathian
Snow S₀ / wind W₀
1,340 / 370Pa

Ground frame designer

A ground frame for a solar plant: Kireshi

The designer opens with this place’s coordinates, latitude 48.2° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 91 km: snow 1,340 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

41Jan61Feb101Mar120Apr130May135Jun141Jul142Aug114Sep89Oct55Nov31Dec

August: 142 kWh/kWp, December: 31 — 4.6 times less.

January: 41 against 39 in the oblast, 5.1% more.

Kireshi: plants, kWh
kWpA yearAugustDecember
55,799710155
1011,5981,420310
1517,3972,130465

Snow and wind: Ужгород

Example: a 10 kW ground frame

For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Khustskyi RaionZakarpattia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.