Solar plant: site data

Solar power plant in Horonda, Mukachivskyi Raion, Zakarpattia Oblast

Horonda: 1,182 kWh per kWp a year, tilt 38° 1° west of south (PVGIS). 3.6% above the oblast median (1,141). #3 of 139 in the rayon, #98 of 613 in the oblast.

Mukachevo, the rayon centre, is 13 km away. 104 m above sea level. 13 km away: Mukachevo, the nearest bigger centre, 1,165 — 1.5% more here. Snow and wind from the nearest regional centre in the DBN — Ужгород, 33 km. 10.98 m between rows, pitch 14.75 m (latitude 48.4°).

Yield of 1 kWp
1,182kWh/year
Tilt
38°1° west of south
10 kW
11,820kWh/year
Row pitch
14.75m · GCR 0.32
T_min
-32 °Cregion IIIB, Transcarpathian
Snow S₀ / wind W₀
1,340 / 370Pa

Ground frame designer

A ground frame for a solar plant: Horonda

The designer opens with this place’s coordinates, latitude 48.4° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 33 km: snow 1,340 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

39Jan62Feb105Mar124Apr134May138Jun143Jul142Aug115Sep91Oct56Nov33Dec

July: 143 kWh/kWp, December: 33 — 4.3 times less.

March: 105 against 98 in the oblast, 7.1% more.

Horonda: plants, kWh
kWpA yearJulyDecember
55,910715165
1011,8201,430330
1517,7302,145495

Snow and wind: Ужгород

Example: a 10 kW ground frame

For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Mukachivskyi RaionZakarpattia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.