Solar plant: site data

Solar power plant in Dorobratovo, Mukachivskyi Raion, Zakarpattia Oblast

Dorobratovo: 1,165 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 2.1% above the oblast median (1,141). #25 of 139 in the rayon, #171 of 613 in the oblast.

Mukachevo, the rayon centre, is 17 km away. 139 m above sea level. 17 km away: Mukachevo, the nearest bigger centre, the same 1,165. Snow and wind from the nearest regional centre in the DBN — Ужгород, 54 km. 10.71 m between rows, pitch 14.53 m (latitude 48.4°).

Yield of 1 kWp
1,165kWh/year
Tilt
37°1° east of south
10 kW
11,647kWh/year
Row pitch
14.53m · GCR 0.33
T_min
-32 °Cregion IIIB, Transcarpathian
Snow S₀ / wind W₀
1,340 / 370Pa

Ground frame designer

A ground frame for a solar plant: Dorobratovo

The designer opens with this place’s coordinates, latitude 48.4° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 54 km: snow 1,340 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan61Feb103Mar121Apr132May136Jun142Jul141Aug115Sep90Oct55Nov31Dec

July: 142 kWh/kWp, December: 31 — 4.6 times less.

March: 103 against 98 in the oblast, 5.1% more.

Dorobratovo: plants, kWh
kWpA yearJulyDecember
55,824710155
1011,6471,420310
1517,4712,130465

Snow and wind: Ужгород

Example: a 10 kW ground frame

For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Mukachivskyi RaionZakarpattia Oblast: rayons and towns

Free calculators

Sources