Solar plant: site data

Solar power plant in Chornyi Potik, Khustskyi Raion, Zakarpattia Oblast

Chornyi Potik: 1,108 kWh per kWp a year, tilt 36° 8° east of south (PVGIS). 2.9% below the oblast median (1,141). #82 of 145 in the rayon, #415 of 613 in the oblast.

Khust, the rayon centre, is 34 km away. 339 m above sea level. 21 km away: Mukachevo, the nearest bigger centre, 1,165 — 4.9% less here. Snow and wind from the nearest regional centre in the DBN — Ужгород, 57 km. 10.50 m between rows, pitch 14.37 m (latitude 48.4°).

Yield of 1 kWp
1,108kWh/year
Tilt
36°8° east of south
10 kW
11,082kWh/year
Row pitch
14.37m · GCR 0.33
T_min
-32 °Cregion IIIB, Transcarpathian
Snow S₀ / wind W₀
1,340 / 370Pa

Ground frame designer

A ground frame for a solar plant: Chornyi Potik

The designer opens with this place’s coordinates, latitude 48.4° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 57 km: snow 1,340 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan57Feb95Mar115Apr126May132Jun138Jul137Aug109Sep84Oct49Nov29Dec

July: 138 kWh/kWp, December: 29 — 4.8 times less.

November: 49 against 53 in the oblast, 7.5% less.

Chornyi Potik: plants, kWh
kWpA yearJulyDecember
55,541690145
1011,0821,380290
1516,6232,070435

Snow and wind: Ужгород

Example: a 10 kW ground frame

For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Khustskyi RaionZakarpattia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.