Solar plant: site data

Solar power plant in Chornotysiv, Berehivskyi Raion, Zakarpattia Oblast

Chornotysiv: 1,180 kWh per kWp a year, tilt 37° facing south (PVGIS). 3.4% above the oblast median (1,141). #75 of 105 in the rayon, #111 of 613 in the oblast.

Berehove, the rayon centre, is 34 km away. 129 m above sea level. 21 km away: Khust, the nearest bigger centre, 978 — 20.6% more here. Snow and wind from the nearest regional centre in the DBN — Ужгород, 82 km. 10.51 m between rows, pitch 14.33 m (latitude 48.1°).

Yield of 1 kWp
1,180kWh/year
Tilt
37°facing south
10 kW
11,803kWh/year
Row pitch
14.33m · GCR 0.33
T_min
-32 °Cregion IIIB, Transcarpathian
Snow S₀ / wind W₀
1,340 / 370Pa

Ground frame designer

A ground frame for a solar plant: Chornotysiv

The designer opens with this place’s coordinates, latitude 48.1° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 82 km: snow 1,340 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

39Jan59Feb103Mar124Apr133May137Jun143Jul143Aug115Sep92Oct57Nov34Dec

July: 143 kWh/kWp, December: 34 — 4.2 times less.

December: 34 against 31 in the oblast, 9.7% more.

Chornotysiv: plants, kWh
kWpA yearJulyDecember
55,902715170
1011,8031,430340
1517,7052,145510

Snow and wind: Ужгород

Example: a 10 kW ground frame

For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Berehivskyi RaionZakarpattia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.