Solar plant: site data
Solar power plant in Chervenovo, Mukachivskyi Raion, Zakarpattia Oblast
Chervenovo: 1,172 kWh per kWp a year, tilt 38° facing south (PVGIS). 2.7% above the oblast median (1,141). #10 of 139 in the rayon, #142 of 613 in the oblast.
Mukachevo, the rayon centre, is 14 km away. 107 m above sea level. 14 km away: Mukachevo, the nearest bigger centre, 1,165 — 0.6% more here. Snow and wind from the nearest regional centre in the DBN — Ужгород, 24 km. 11.05 m between rows, pitch 14.82 m (latitude 48.5°).
- Yield of 1 kWp
- 1,172kWh/year
- Tilt
- 38°facing south
- 10 kW
- 11,724kWh/year
- Row pitch
- 14.82m · GCR 0.32
- T_min
- -32 °Cregion IIIB, Transcarpathian
- Snow S₀ / wind W₀
- 1,340 / 370Pa
Ground frame designer
A ground frame for a solar plant: Chervenovo
The designer opens with this place’s coordinates, latitude 48.5° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 24 km: snow 1,340 Pa, wind 370 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 142 kWh/kWp, December: 31 — 4.6 times less.
January: 35 against 39 in the oblast, 10.3% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,862 | 710 | 155 |
| 10 | 11,724 | 1,420 | 310 |
| 15 | 17,586 | 2,130 | 465 |
Example: a 10 kW ground frame
For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.
How these numbers are computed
Nearby
- Domboky2 km1,172 kWh/kWp
- Znyats’ovo2 km1,173 kWh/kWp
- Klyachanovo2 km1,173 kWh/kWp
- Chabanivka3 km1,173 kWh/kWp
- Kaidanovo3 km1,169 kWh/kWp
- Dubrivka4 km1,173 kWh/kWp
All places: Mukachivskyi RaionZakarpattia Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.