Solar plant: site data

Solar power plant in Chereivtsi, Mukachivskyi Raion, Zakarpattia Oblast

Chereivtsi: 1,146 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). Exactly the oblast median (1,141). #60 of 139 in the rayon, #267 of 613 in the oblast.

Mukachevo, the rayon centre, is 7 km away. 136 m above sea level. 7 km away: Mukachevo, the nearest bigger centre, 1,165 — 1.6% less here. Snow and wind from the nearest regional centre in the DBN — Ужгород, 30 km. 11.06 m between rows, pitch 14.83 m (latitude 48.5°).

Yield of 1 kWp
1,146kWh/year
Tilt
38°1° east of south
10 kW
11,460kWh/year
Row pitch
14.83m · GCR 0.32
T_min
-32 °Cregion IIIB, Transcarpathian
Snow S₀ / wind W₀
1,340 / 370Pa

Ground frame designer

A ground frame for a solar plant: Chereivtsi

The designer opens with this place’s coordinates, latitude 48.5° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 30 km: snow 1,340 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

40Jan62Feb100Mar119Apr130May133Jun139Jul139Aug112Sep88Oct53Nov31Dec

July: 139 kWh/kWp, December: 31 — 4.5 times less.

February: 62 against 60 in the oblast, 3.3% more.

Chereivtsi: plants, kWh
kWpA yearJulyDecember
55,730695155
1011,4601,390310
1517,1902,085465

Snow and wind: Ужгород

Example: a 10 kW ground frame

For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Mukachivskyi RaionZakarpattia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.