Solar plant: site data
Solar power plant in Bobovyshche, Mukachivskyi Raion, Zakarpattia Oblast
Bobovyshche: 1,145 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). Exactly the oblast median (1,141). #65 of 139 in the rayon, #282 of 613 in the oblast.
Mukachevo, the rayon centre, is 10 km away. 126 m above sea level. 10 km away: Mukachevo, the nearest bigger centre, 1,165 — 1.8% less here. Snow and wind from the nearest regional centre in the DBN — Ужгород, 29 km. 10.84 m between rows, pitch 14.66 m (latitude 48.5°).
- Yield of 1 kWp
- 1,145kWh/year
- Tilt
- 37°1° east of south
- 10 kW
- 11,445kWh/year
- Row pitch
- 14.66m · GCR 0.33
- T_min
- -32 °Cregion IIIB, Transcarpathian
- Snow S₀ / wind W₀
- 1,340 / 370Pa
Ground frame designer
A ground frame for a solar plant: Bobovyshche
The designer opens with this place’s coordinates, latitude 48.5° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 29 km: snow 1,340 Pa, wind 370 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 139 kWh/kWp, December: 31 — 4.5 times less.
January: 41 against 39 in the oblast, 5.1% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,723 | 695 | 155 |
| 10 | 11,445 | 1,390 | 310 |
| 15 | 17,168 | 2,085 | 465 |
Example: a 10 kW ground frame
For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.
How these numbers are computed
Nearby
- Hrybivtsi2 km1,145 kWh/kWp
- Lokhovo3 km1,145 kWh/kWp
- Kopynivtsi3 km1,155 kWh/kWp
- Shchaslyve3 km1,114 kWh/kWp
- Ilkivtsi4 km1,108 kWh/kWp
- Zhukovo4 km1,161 kWh/kWp
All places: Mukachivskyi RaionZakarpattia Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.