Solar plant: site data

Solar power plant in Bereznyky, Khustskyi Raion, Zakarpattia Oblast

Bereznyky: 1,115 kWh per kWp a year, tilt 37° 3° east of south (PVGIS). 2.3% below the oblast median (1,141). #76 of 145 in the rayon, #395 of 613 in the oblast.

Khust, the rayon centre, is 38 km away. 304 m above sea level. 38 km away: Mukachevo, the nearest bigger centre, 1,165 — 4.3% less here. Snow and wind from the nearest regional centre in the DBN — Ужгород, 69 km. 10.83 m between rows, pitch 14.65 m (latitude 48.5°).

Yield of 1 kWp
1,115kWh/year
Tilt
37°3° east of south
10 kW
11,152kWh/year
Row pitch
14.65m · GCR 0.33
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,340 / 370Pa

Ground frame designer

A ground frame for a solar plant: Bereznyky

The designer opens with this place’s coordinates, latitude 48.5° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 69 km: snow 1,340 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

44Jan61Feb96Mar111Apr124May130Jun136Jul136Aug109Sep86Oct52Nov31Dec

July: 136 kWh/kWp, December: 31 — 4.4 times less.

January: 44 against 39 in the oblast, 12.8% more.

Bereznyky: plants, kWh
kWpA yearJulyDecember
55,576680155
1011,1521,360310
1516,7282,040465

Snow and wind: Ужгород

Example: a 10 kW ground frame

For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Khustskyi RaionZakarpattia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.