Solar plant: site data

Solar power plant in Baranyntsi, Uzhhorodskyi Raion, Zakarpattia Oblast

Baranyntsi: 1,172 kWh per kWp a year, tilt 38° facing south (PVGIS). 2.7% above the oblast median (1,141). #40 of 122 in the rayon, #144 of 613 in the oblast.

Uzhhorod, the rayon centre, is 6 km away. 122 m above sea level. 6 km away: Uzhhorod, the nearest bigger centre, the same 1,171. Snow and wind from the nearest regional centre in the DBN — Ужгород, 5 km. 11.13 m between rows, pitch 14.90 m (latitude 48.6°).

Yield of 1 kWp
1,172kWh/year
Tilt
38°facing south
10 kW
11,717kWh/year
Row pitch
14.90m · GCR 0.32
T_min
-32 °Cregion IIIB, Transcarpathian
Snow S₀ / wind W₀
1,340 / 370Pa

Ground frame designer

A ground frame for a solar plant: Baranyntsi

The designer opens with this place’s coordinates, latitude 48.6° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 5 km: snow 1,340 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan60Feb105Mar125Apr135May137Jun141Jul141Aug116Sep89Oct53Nov31Dec

July: 141 kWh/kWp, December: 31 — 4.5 times less.

March: 105 against 98 in the oblast, 7.1% more.

Baranyntsi: plants, kWh
kWpA yearJulyDecember
55,859705155
1011,7171,410310
1517,5762,115465

Snow and wind: Ужгород

Example: a 10 kW ground frame

For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Uzhhorodskyi RaionZakarpattia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.