Tsminy: 1,080 kWh per kWp a year, tilt 38° 4° east of south (PVGIS). Exactly the oblast median (1,084). #1 of 167 in the rayon, #672 of 1120 in the oblast.

Kamin-Kashyrskyi, the rayon centre, is 72 km away. 166 m above sea level. 5 km away: Varash, the nearest bigger centre, 1,067 — 1.2% more here. Snow and wind from the nearest regional centre in the DBN — Луцьк, 71 km. 13.73 m between rows, pitch 17.50 m (latitude 51.3°).

Yield of 1 kWp
1,080kWh/year
Tilt
38°4° east of south
10 kW
10,795kWh/year
Row pitch
17.50m · GCR 0.27
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,240 / 480Pa

Ground frame designer

A ground frame for a solar plant: Tsminy

The designer opens with this place’s coordinates, latitude 51.3° for the row spacing and the DBN loads of the nearest regional centre — Луцьк, 71 km: snow 1,240 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

33Jan55Feb93Mar117Apr129May134Jun135Jul135Aug106Sep79Oct36Nov27Dec

July: 135 kWh/kWp, December: 27 — 5.0 times less.

February: 55 against 52 in the oblast, 5.8% more.

Tsminy: plants, kWh
kWpA yearJulyDecember
55,398675135
1010,7951,350270
1516,1932,025405

Snow and wind: Луцьк

Example: a 10 kW ground frame

For the loads of Lutsk: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 50,491 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kamin-Kashyrskyi RaionVolyn Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.