Solar plant: site data

Solar power plant in Stari Chervyshcha, Kamin-Kashyrskyi Raion, Volyn Oblast

Stari Chervyshcha: 1,057 kWh per kWp a year, tilt 39° 4° east of south (PVGIS). 2.6% below the oblast median (1,084). #119 of 167 in the rayon, #1064 of 1120 in the oblast.

Kamin-Kashyrskyi, the rayon centre, is 28 km away. 153 m above sea level. 28 km away: Kamin-Kashyrskyi, the nearest bigger centre, the same 1,058. Snow and wind from the nearest regional centre in the DBN — Луцьк, 95 km. 14.41 m between rows, pitch 18.13 m (latitude 51.6°).

Yield of 1 kWp
1,057kWh/year
Tilt
39°4° east of south
10 kW
10,565kWh/year
Row pitch
18.13m · GCR 0.26
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,240 / 480Pa

Ground frame designer

A ground frame for a solar plant: Stari Chervyshcha

The designer opens with this place’s coordinates, latitude 51.6° for the row spacing and the DBN loads of the nearest regional centre — Луцьк, 95 km: snow 1,240 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan50Feb93Mar115Apr126May132Jun133Jul132Aug105Sep75Oct35Nov26Dec

July: 133 kWh/kWp, December: 26 — 5.1 times less.

December: 26 against 28 in the oblast, 7.1% less.

Stari Chervyshcha: plants, kWh
kWpA yearJulyDecember
55,283665130
1010,5651,330260
1515,8481,995390

Snow and wind: Луцьк

Example: a 10 kW ground frame

For the loads of Lutsk: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 50,491 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kamin-Kashyrskyi RaionVolyn Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.