Solar plant: site data

Solar power plant in Poromiv, Volodymyrskyi Raion, Volyn Oblast

Poromiv: 1,089 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). Exactly the oblast median (1,084). #151 of 215 in the rayon, #425 of 1120 in the oblast.

Volodymyr-Volynskyi, the rayon centre, is 20 km away. 224 m above sea level. 20 km away: Volodymyr-Volynskyi, the nearest bigger centre, 1,100 — 1.0% less here. Snow and wind from the nearest regional centre in the DBN — Луцьк, 88 km. 13.12 m between rows, pitch 16.89 m (latitude 50.8°).

Yield of 1 kWp
1,089kWh/year
Tilt
38°1° east of south
10 kW
10,887kWh/year
Row pitch
16.89m · GCR 0.28
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,240 / 480Pa

Ground frame designer

A ground frame for a solar plant: Poromiv

The designer opens with this place’s coordinates, latitude 50.8° for the row spacing and the DBN loads of the nearest regional centre — Луцьк, 88 km: snow 1,240 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

33Jan49Feb90Mar119Apr132May136Jun135Jul133Aug109Sep83Oct41Nov30Dec

June: 136 kWh/kWp, December: 30 — 4.5 times less.

November: 41 against 37 in the oblast, 10.8% more.

Poromiv: plants, kWh
kWpA yearJuneDecember
55,444680150
1010,8871,360300
1516,3312,040450

Snow and wind: Луцьк

Example: a 10 kW ground frame

For the loads of Lutsk: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 50,491 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Volodymyrskyi RaionVolyn Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.