Solar plant: site data

Solar power plant in Polumiane, Volodymyrskyi Raion, Volyn Oblast

Polumiane: 1,086 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). Exactly the oblast median (1,084). #177 of 215 in the rayon, #514 of 1120 in the oblast.

Volodymyr-Volynskyi, the rayon centre, is 17 km away. 184 m above sea level. 17 km away: Volodymyr-Volynskyi, the nearest bigger centre, 1,100 — 1.2% less here. Snow and wind from the nearest regional centre in the DBN — Луцьк, 88 km. 13.31 m between rows, pitch 17.08 m (latitude 50.9°).

Yield of 1 kWp
1,086kWh/year
Tilt
38°2° east of south
10 kW
10,861kWh/year
Row pitch
17.08m · GCR 0.28
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,240 / 480Pa

Ground frame designer

A ground frame for a solar plant: Polumiane

The designer opens with this place’s coordinates, latitude 50.9° for the row spacing and the DBN loads of the nearest regional centre — Луцьк, 88 km: snow 1,240 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan52Feb94Mar118Apr129May135Jun135Jul131Aug106Sep81Oct39Nov31Dec

June: 135 kWh/kWp, December: 31 — 4.4 times less.

December: 31 against 28 in the oblast, 10.7% more.

Polumiane: plants, kWh
kWpA yearJuneDecember
55,431675155
1010,8611,350310
1516,2912,025465

Snow and wind: Луцьк

Example: a 10 kW ground frame

For the loads of Lutsk: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 50,491 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Volodymyrskyi RaionVolyn Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.