Solar power plant in Podmanovo, Kovelskyi Raion, Volyn Oblast

Podmanovo: 1,061 kWh per kWp a year, tilt 39° 4° east of south (PVGIS). 2.2% below the oblast median (1,084). #348 of 383 in the rayon, #1020 of 1120 in the oblast.

Kovel, the rayon centre, is 67 km away. 165 m above sea level. 67 km away: Kovel, the nearest bigger centre, 1,079 — 1.7% less here. Snow and wind from the nearest regional centre in the DBN — Луцьк, 132 km. 14.24 m between rows, pitch 17.96 m (latitude 51.5°).

Yield of 1 kWp
1,061kWh/year
Tilt
39°4° east of south
10 kW
10,610kWh/year
Row pitch
17.96m · GCR 0.27
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,240 / 480Pa

Ground frame designer

A ground frame for a solar plant: Podmanovo

The designer opens with this place’s coordinates, latitude 51.5° for the row spacing and the DBN loads of the nearest regional centre — Луцьк, 132 km: snow 1,240 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

33Jan52Feb92Mar116Apr126May132Jun134Jul130Aug104Sep78Oct36Nov28Dec

July: 134 kWh/kWp, December: 28 — 4.8 times less.

August: 130 against 134 in the oblast, 3.0% less.

Podmanovo: plants, kWh
kWpA yearJulyDecember
55,305670140
1010,6101,340280
1515,9152,010420

Snow and wind: Луцьк

Example: a 10 kW ground frame

For the loads of Lutsk: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 50,491 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kovelskyi RaionVolyn Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.