Solar plant: site data

Solar power plant in Mostyshche, Kamin-Kashyrskyi Raion, Volyn Oblast

Mostyshche: 1,072 kWh per kWp a year, tilt 39° 4° east of south (PVGIS). 1.1% below the oblast median (1,084). #18 of 167 in the rayon, #801 of 1120 in the oblast.

Kamin-Kashyrskyi, the rayon centre, is 10 km away. 157 m above sea level. 10 km away: Kamin-Kashyrskyi, the nearest bigger centre, 1,058 — 1.4% more here. Snow and wind from the nearest regional centre in the DBN — Луцьк, 107 km. 14.49 m between rows, pitch 18.21 m (latitude 51.7°).

Yield of 1 kWp
1,072kWh/year
Tilt
39°4° east of south
10 kW
10,720kWh/year
Row pitch
18.21m · GCR 0.26
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,240 / 480Pa

Ground frame designer

A ground frame for a solar plant: Mostyshche

The designer opens with this place’s coordinates, latitude 51.7° for the row spacing and the DBN loads of the nearest regional centre — Луцьк, 107 km: snow 1,240 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

32Jan52Feb94Mar116Apr129May134Jun135Jul133Aug106Sep77Oct35Nov27Dec

July: 135 kWh/kWp, December: 27 — 5.0 times less.

November: 35 against 37 in the oblast, 5.4% less.

Mostyshche: plants, kWh
kWpA yearJulyDecember
55,360675135
1010,7201,350270
1516,0802,025405

Snow and wind: Луцьк

Example: a 10 kW ground frame

For the loads of Lutsk: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 50,491 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kamin-Kashyrskyi RaionVolyn Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.