Solar plant: site data

Solar power plant in Cheremoshne, Kovelskyi Raion, Volyn Oblast

Cheremoshne: 1,062 kWh per kWp a year, tilt 38° 3° east of south (PVGIS). 2.1% below the oblast median (1,084). #341 of 383 in the rayon, #1013 of 1120 in the oblast.

Kovel, the rayon centre, is 25 km away. 168 m above sea level. 25 km away: Kovel, the nearest bigger centre, 1,079 — 1.6% less here. Snow and wind from the nearest regional centre in the DBN — Луцьк, 67 km. 13.77 m between rows, pitch 17.54 m (latitude 51.3°).

Yield of 1 kWp
1,062kWh/year
Tilt
38°3° east of south
10 kW
10,616kWh/year
Row pitch
17.54m · GCR 0.27
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,240 / 480Pa

Ground frame designer

A ground frame for a solar plant: Cheremoshne

The designer opens with this place’s coordinates, latitude 51.3° for the row spacing and the DBN loads of the nearest regional centre — Луцьк, 67 km: snow 1,240 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

33Jan50Feb94Mar114Apr127May133Jun133Jul133Aug105Sep77Oct35Nov27Dec

June: 133 kWh/kWp, December: 27 — 4.9 times less.

November: 35 against 37 in the oblast, 5.4% less.

Cheremoshne: plants, kWh
kWpA yearJuneDecember
55,308665135
1010,6161,330270
1515,9241,995405

Snow and wind: Луцьк

Example: a 10 kW ground frame

For the loads of Lutsk: 11.16 kWp, 18 panels, 387 kg of steel, 14 piles, materials ≈ 51,425 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kovelskyi RaionVolyn Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.