Solar plant: site data
Solar power plant in Budnyky, Kovelskyi Raion, Volyn Oblast
Budnyky: 1,067 kWh per kWp a year, tilt 39° 3° east of south (PVGIS). 1.6% below the oblast median (1,084). #281 of 383 in the rayon, #922 of 1120 in the oblast.
Kovel, the rayon centre, is 66 km away. 169 m above sea level. 66 km away: Kovel, the nearest bigger centre, 1,079 — 1.2% less here. Snow and wind from the nearest regional centre in the DBN — Луцьк, 126 km. 14.08 m between rows, pitch 17.80 m (latitude 51.3°).
- Yield of 1 kWp
- 1,067kWh/year
- Tilt
- 39°3° east of south
- 10 kW
- 10,666kWh/year
- Row pitch
- 17.80m · GCR 0.27
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,240 / 480Pa
Ground frame designer
A ground frame for a solar plant: Budnyky
The designer opens with this place’s coordinates, latitude 51.3° for the row spacing and the DBN loads of the nearest regional centre — Луцьк, 126 km: snow 1,240 Pa, wind 480 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 135 kWh/kWp, December: 29 — 4.7 times less.
January: 35 against 33 in the oblast, 6.1% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,333 | 675 | 145 |
| 10 | 10,666 | 1,350 | 290 |
| 15 | 15,999 | 2,025 | 435 |
Example: a 10 kW ground frame
For the loads of Lutsk: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 50,491 UAH.
How these numbers are computed
Nearby
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.