Solar plant: site data

Solar power plant in Bronytsia, Kamin-Kashyrskyi Raion, Volyn Oblast

Bronytsia: 1,061 kWh per kWp a year, tilt 39° 4° east of south (PVGIS). 2.2% below the oblast median (1,084). #104 of 167 in the rayon, #1025 of 1120 in the oblast.

Kamin-Kashyrskyi, the rayon centre, is 14 km away. 153 m above sea level. 14 km away: Kamin-Kashyrskyi, the nearest bigger centre, the same 1,058. Snow and wind from the nearest regional centre in the DBN — Луцьк, 101 km. 14.47 m between rows, pitch 18.19 m (latitude 51.7°).

Yield of 1 kWp
1,061kWh/year
Tilt
39°4° east of south
10 kW
10,608kWh/year
Row pitch
18.19m · GCR 0.26
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,240 / 480Pa

Ground frame designer

A ground frame for a solar plant: Bronytsia

The designer opens with this place’s coordinates, latitude 51.7° for the row spacing and the DBN loads of the nearest regional centre — Луцьк, 101 km: snow 1,240 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

33Jan51Feb94Mar115Apr126May133Jun133Jul133Aug105Sep75Oct35Nov26Dec

June: 133 kWh/kWp, December: 26 — 5.1 times less.

December: 26 against 28 in the oblast, 7.1% less.

Bronytsia: plants, kWh
kWpA yearJuneDecember
55,304665130
1010,6081,330260
1515,9121,995390

Snow and wind: Луцьк

Example: a 10 kW ground frame

For the loads of Lutsk: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 50,491 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kamin-Kashyrskyi RaionVolyn Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.