Solar plant: site data

Solar power plant in Ukrayinske, Khmilnytskyi Raion, Vinnytsia Oblast

Ukrayinske: 1,108 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 3.1% below the oblast median (1,143). #148 of 197 in the rayon, #1157 of 1206 in the oblast.

Khmilnyk, the rayon centre, is 15 km away. 291 m above sea level. 15 km away: Khmilnyk, the nearest bigger centre, 1,116 — 0.7% less here. Snow and wind from the nearest regional centre in the DBN — Хмельницький, 65 km. 11.50 m between rows, pitch 15.37 m (latitude 49.7°).

Yield of 1 kWp
1,108kWh/year
Tilt
36°2° east of south
10 kW
11,076kWh/year
Row pitch
15.37m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,340 / 500Pa

Ground frame designer

A ground frame for a solar plant: Ukrayinske

The designer opens with this place’s coordinates, latitude 49.7° for the row spacing and the DBN loads of the nearest regional centre — Хмельницький, 65 km: snow 1,340 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

32Jan50Feb89Mar118Apr135May139Jun142Jul138Aug112Sep85Oct37Nov30Dec

July: 142 kWh/kWp, December: 30 — 4.7 times less.

January: 32 against 36 in the oblast, 9.9% less.

Ukrayinske: plants, kWh
kWpA yearJulyDecember
55,538710150
1011,0761,420300
1516,6142,130450

Snow and wind: Хмельницький

Example: a 10 kW ground frame

For the loads of Khmelnytskyi: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Khmilnytskyi RaionVinnytsia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.