Solar plant: site data

Solar power plant in Tereshki, Zhmerynskyi Raion, Vinnytsia Oblast

Tereshki: 1,131 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 1.0% below the oblast median (1,143). #117 of 151 in the rayon, #802 of 1206 in the oblast.

Zhmerynka, the rayon centre, is 36 km away. 316 m above sea level. 28 km away: Vinkivtsi, the nearest bigger centre, the same 1,127. Snow and wind from the nearest regional centre in the DBN — Хмельницький, 64 km. 10.97 m between rows, pitch 14.84 m (latitude 49.0°).

Yield of 1 kWp
1,131kWh/year
Tilt
36°1° east of south
10 kW
11,312kWh/year
Row pitch
14.84m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,340 / 500Pa

Ground frame designer

A ground frame for a solar plant: Tereshki

The designer opens with this place’s coordinates, latitude 49.0° for the row spacing and the DBN loads of the nearest regional centre — Хмельницький, 64 km: snow 1,340 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan52Feb89Mar121Apr138May140Jun143Jul141Aug115Sep87Oct40Nov31Dec

July: 143 kWh/kWp, December: 31 — 4.6 times less.

March: 89 against 92 in the oblast, 3.3% less.

Tereshki: plants, kWh
kWpA yearJulyDecember
55,656715155
1011,3121,430310
1516,9682,145465

Snow and wind: Хмельницький

Example: a 10 kW ground frame

For the loads of Khmelnytskyi: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed