Solar plant: site data

Solar power plant in Tarasky, Khmilnytskyi Raion, Vinnytsia Oblast

Tarasky: 1,106 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 3.2% below the oblast median (1,143). #165 of 197 in the rayon, #1174 of 1206 in the oblast.

Khmilnyk, the rayon centre, is 26 km away. 266 m above sea level. 26 km away: Khmilnyk, the nearest bigger centre, 1,116 — 0.9% less here. Snow and wind from the nearest regional centre in the DBN — Вінниця, 55 km. 11.54 m between rows, pitch 15.41 m (latitude 49.7°).

Yield of 1 kWp
1,106kWh/year
Tilt
36°2° east of south
10 kW
11,058kWh/year
Row pitch
15.41m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,360 / 470Pa

Ground frame designer

A ground frame for a solar plant: Tarasky

The designer opens with this place’s coordinates, latitude 49.7° for the row spacing and the DBN loads of the nearest regional centre — Вінниця, 55 km: snow 1,360 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

29Jan50Feb87Mar119Apr136May142Jun143Jul139Aug112Sep84Oct37Nov28Dec

July: 143 kWh/kWp, December: 28 — 5.1 times less.

January: 29 against 36 in the oblast, 18.3% less.

Tarasky: plants, kWh
kWpA yearJulyDecember
55,529715140
1011,0581,430280
1516,5872,145420

Snow and wind: Вінниця

Example: a 10 kW ground frame

For the loads of Vinnytsia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Khmilnytskyi RaionVinnytsia Oblast: rayons and towns

Free calculators

Sources