Solar plant: site data
Solar power plant in Stina, Tulchynskyi Raion, Vinnytsia Oblast
Stina: 1,145 kWh per kWp a year, tilt 35° 3° west of south (PVGIS). Exactly the oblast median (1,143). #174 of 184 in the rayon, #541 of 1206 in the oblast.
Tulchyn, the rayon centre, is 41 km away. 170 m above sea level. 41 km away: Tulchyn, the nearest bigger centre, 1,156 — 0.9% less here. Snow and wind from the nearest regional centre in the DBN — Вінниця, 86 km. 10.28 m between rows, pitch 14.20 m (latitude 48.5°).
- Yield of 1 kWp
- 1,145kWh/year
- Tilt
- 35°3° west of south
- 10 kW
- 11,452kWh/year
- Row pitch
- 14.20m · GCR 0.34
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 1,360 / 470Pa
Ground frame designer
A ground frame for a solar plant: Stina
The designer opens with this place’s coordinates, latitude 48.5° for the row spacing and the DBN loads of the nearest regional centre — Вінниця, 86 km: snow 1,360 Pa, wind 470 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 146 kWh/kWp, December: 31 — 4.7 times less.
February: 49 against 52 in the oblast, 5.8% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,726 | 730 | 155 |
| 10 | 11,452 | 1,460 | 310 |
| 15 | 17,178 | 2,190 | 465 |
Example: a 10 kW ground frame
For the loads of Vinnytsia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.
How these numbers are computed
Nearby
- Rusava3 km1,157 kWh/kWp
- Vyla5 km1,157 kWh/kWp
- Hnatkiv6 km1,157 kWh/kWp
- Kalynka6 km1,156 kWh/kWp
- Pylypy-Borivski7 km1,158 kWh/kWp
- Klembivka8 km1,159 kWh/kWp
All places: Tulchynskyi RaionVinnytsia Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.