Solar plant: site data
Solar power plant in Obukhiv, Mohyliv-Podilskyi Raion, Vinnytsia Oblast
Obukhiv: 1,143 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). Exactly the oblast median (1,143). #139 of 158 in the rayon, #603 of 1206 in the oblast.
Mohyliv-Podilskyy, the rayon centre, is 40 km away. 283 m above sea level. 37 km away: Zhmerynka, the nearest bigger centre, 1,136 — 0.6% more here. Snow and wind from the nearest regional centre in the DBN — Вінниця, 71 km. 10.79 m between rows, pitch 14.66 m (latitude 48.8°).
- Yield of 1 kWp
- 1,143kWh/year
- Tilt
- 36°3° east of south
- 10 kW
- 11,429kWh/year
- Row pitch
- 14.66m · GCR 0.33
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,360 / 470Pa
Ground frame designer
A ground frame for a solar plant: Obukhiv
The designer opens with this place’s coordinates, latitude 48.8° for the row spacing and the DBN loads of the nearest regional centre — Вінниця, 71 km: snow 1,360 Pa, wind 470 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 144 kWh/kWp, December: 32 — 4.5 times less.
January: 34 against 36 in the oblast, 4.2% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,715 | 720 | 160 |
| 10 | 11,429 | 1,440 | 320 |
| 15 | 17,144 | 2,160 | 480 |
Example: a 10 kW ground frame
For the loads of Vinnytsia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.
How these numbers are computed
Nearby
- Berliadka2 km1,143 kWh/kWp
- Kotiuzhany5 km1,143 kWh/kWp
- Horai6 km1,144 kWh/kWp
- Ukrainske6 km1,145 kWh/kWp
- Polove6 km1,139 kWh/kWp
- Kopaihorod7 km1,144 kWh/kWp
All places: Mohyliv-Podilskyi RaionVinnytsia Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.