Solar plant: site data

Solar power plant in Khodaky, Zhmerynskyi Raion, Vinnytsia Oblast

Khodaky: 1,129 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 1.2% below the oblast median (1,143). #130 of 151 in the rayon, #842 of 1206 in the oblast.

Zhmerynka, the rayon centre, is 48 km away. 302 m above sea level. 16 km away: Vinkivtsi, the nearest bigger centre, the same 1,127. Snow and wind from the nearest regional centre in the DBN — Хмельницький, 55 km. 10.98 m between rows, pitch 14.85 m (latitude 49.0°).

Yield of 1 kWp
1,129kWh/year
Tilt
36°1° east of south
10 kW
11,290kWh/year
Row pitch
14.85m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,340 / 500Pa

Ground frame designer

A ground frame for a solar plant: Khodaky

The designer opens with this place’s coordinates, latitude 49.0° for the row spacing and the DBN loads of the nearest regional centre — Хмельницький, 55 km: snow 1,340 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan52Feb88Mar120Apr138May141Jun144Jul141Aug116Sep87Oct40Nov31Dec

July: 144 kWh/kWp, December: 31 — 4.6 times less.

March: 88 against 92 in the oblast, 4.3% less.

Khodaky: plants, kWh
kWpA yearJulyDecember
55,645720155
1011,2901,440310
1516,9352,160465

Snow and wind: Хмельницький

Example: a 10 kW ground frame

For the loads of Khmelnytskyi: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Zhmerynskyi RaionVinnytsia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.