Solar plant: site data

Solar power plant in Zahiria, Ternopilskyi Raion, Ternopil Oblast

Zahiria: 1,084 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 0.8% below the oblast median (1,093). #177 of 313 in the rayon, #516 of 744 in the oblast.

Ternopil, the rayon centre, is 37 km away. 364 m above sea level. 30 km away: Zboriv, the nearest bigger centre, the same 1,086. Snow and wind from the nearest regional centre in the DBN — Тернопіль, 38 km. 11.97 m between rows, pitch 15.79 m (latitude 49.9°).

Yield of 1 kWp
1,084kWh/year
Tilt
37°1° east of south
10 kW
10,843kWh/year
Row pitch
15.79m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,390 / 520Pa

Ground frame designer

A ground frame for a solar plant: Zahiria

The designer opens with this place’s coordinates, latitude 49.9° for the row spacing and the DBN loads of the nearest regional centre — Тернопіль, 38 km: snow 1,390 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

31Jan51Feb90Mar118Apr130May133Jun137Jul135Aug111Sep83Oct37Nov29Dec

July: 137 kWh/kWp, December: 29 — 4.7 times less.

January: 31 against 34 in the oblast, 8.8% less.

Zahiria: plants, kWh
kWpA yearJulyDecember
55,422685145
1010,8431,370290
1516,2652,055435

Snow and wind: Тернопіль

Example: a 10 kW ground frame

For the loads of Ternopil: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Ternopilskyi RaionTernopil Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.