Solar plant: site data

Solar power plant in Tseliiv, Chortkivskyi Raion, Ternopil Oblast

Tseliiv: 1,112 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 1.7% above the oblast median (1,093). #194 of 296 in the rayon, #195 of 744 in the oblast.

Chortkiv, the rayon centre, is 22 km away. 270 m above sea level. 22 km away: Chortkiv, the nearest bigger centre, 1,126 — 1.3% less here. Snow and wind from the nearest regional centre in the DBN — Тернопіль, 54 km. 11.34 m between rows, pitch 15.16 m (latitude 49.2°).

Yield of 1 kWp
1,112kWh/year
Tilt
37°1° east of south
10 kW
11,115kWh/year
Row pitch
15.16m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,390 / 520Pa

Ground frame designer

A ground frame for a solar plant: Tseliiv

The designer opens with this place’s coordinates, latitude 49.2° for the row spacing and the DBN loads of the nearest regional centre — Тернопіль, 54 km: snow 1,390 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan53Feb95Mar118Apr132May135Jun138Jul137Aug113Sep85Oct39Nov32Dec

July: 138 kWh/kWp, December: 32 — 4.3 times less.

December: 32 against 30 in the oblast, 6.7% more.

Tseliiv: plants, kWh
kWpA yearJulyDecember
55,558690160
1011,1151,380320
1516,6732,070480

Snow and wind: Тернопіль

Example: a 10 kW ground frame

For the loads of Ternopil: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Chortkivskyi RaionTernopil Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.