Solar plant: site data

Solar power plant in Sukhostav, Chortkivskyi Raion, Ternopil Oblast

Sukhostav: 1,113 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 1.9% above the oblast median (1,093). #177 of 296 in the rayon, #177 of 744 in the oblast.

Chortkiv, the rayon centre, is 16 km away. 332 m above sea level. 16 km away: Chortkiv, the nearest bigger centre, 1,126 — 1.1% less here. Snow and wind from the nearest regional centre in the DBN — Тернопіль, 48 km. 11.34 m between rows, pitch 15.16 m (latitude 49.2°).

Yield of 1 kWp
1,113kWh/year
Tilt
37°2° east of south
10 kW
11,134kWh/year
Row pitch
15.16m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,390 / 520Pa

Ground frame designer

A ground frame for a solar plant: Sukhostav

The designer opens with this place’s coordinates, latitude 49.2° for the row spacing and the DBN loads of the nearest regional centre — Тернопіль, 48 km: snow 1,390 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan55Feb95Mar117Apr131May134Jun138Jul136Aug112Sep85Oct39Nov32Dec

July: 138 kWh/kWp, December: 32 — 4.3 times less.

January: 38 against 34 in the oblast, 11.8% more.

Sukhostav: plants, kWh
kWpA yearJulyDecember
55,567690160
1011,1341,380320
1516,7012,070480

Snow and wind: Тернопіль

Example: a 10 kW ground frame

For the loads of Ternopil: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Chortkivskyi RaionTernopil Oblast: rayons and towns

Free calculators

Sources