Solar power plant in Sukhodil, Chortkivskyi Raion, Ternopil Oblast
Sukhodil: 1,112 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 1.8% above the oblast median (1,093). #190 of 296 in the rayon, #190 of 744 in the oblast.
Chortkiv, the rayon centre, is 27 km away. 287 m above sea level. 27 km away: Chortkiv, the nearest bigger centre, 1,126 — 1.2% less here. Snow and wind from the nearest regional centre in the DBN — Тернопіль, 70 km. 10.99 m between rows, pitch 14.86 m (latitude 49.0°).
- Yield of 1 kWp
- 1,112kWh/year
- Tilt
- 36°2° east of south
- 10 kW
- 11,122kWh/year
- Row pitch
- 14.86m · GCR 0.32
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,390 / 520Pa
Ground frame designer
A ground frame for a solar plant: Sukhodil
The designer opens with this place’s coordinates, latitude 49.0° for the row spacing and the DBN loads of the nearest regional centre — Тернопіль, 70 km: snow 1,390 Pa, wind 520 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 140 kWh/kWp, December: 31 — 4.5 times less.
January: 37 against 34 in the oblast, 8.8% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,561 | 700 | 155 |
| 10 | 11,122 | 1,400 | 310 |
| 15 | 16,683 | 2,100 | 465 |
Example: a 10 kW ground frame
For the loads of Ternopil: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.
How these numbers are computed
Nearby
- Sydoriv3 km1,111 kWh/kWp
- Krykiv4 km1,109 kWh/kWp
- Bodnarivka4 km1,109 kWh/kWp
- Husiatyn4 km1,106 kWh/kWp
- Chabarivka5 km1,115 kWh/kWp
- Vasylkiv6 km1,123 kWh/kWp
All places: Chortkivskyi RaionTernopil Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.