Solar plant: site data
Solar power plant in Stinka, Chortkivskyi Raion, Ternopil Oblast
Stinka: 1,121 kWh per kWp a year, tilt 37° facing south (PVGIS). 2.6% above the oblast median (1,093). #106 of 296 in the rayon, #106 of 744 in the oblast.
Chortkiv, the rayon centre, is 41 km away. 338 m above sea level. 19 km away: Tlumach, the nearest bigger centre, 1,105 — 1.4% more here. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 39 km. 11.15 m between rows, pitch 14.97 m (latitude 48.9°).
- Yield of 1 kWp
- 1,121kWh/year
- Tilt
- 37°facing south
- 10 kW
- 11,209kWh/year
- Row pitch
- 14.97m · GCR 0.32
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,410 / 500Pa
Ground frame designer
A ground frame for a solar plant: Stinka
The designer opens with this place’s coordinates, latitude 48.9° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 39 km: snow 1,410 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 137 kWh/kWp, December: 35 — 3.9 times less.
January: 42 against 34 in the oblast, 23.5% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,605 | 685 | 175 |
| 10 | 11,209 | 1,370 | 350 |
| 15 | 16,814 | 2,055 | 525 |
Snow and wind: Івано-Франківськ
Example: a 10 kW ground frame
For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.
How these numbers are computed
Nearby
- Mlynky2 km1,120 kWh/kWp
- Deleva2 km1,113 kWh/kWp
- Vadova3 km1,110 kWh/kWp
- Rublyn3 km1,120 kWh/kWp
- Kosmyryn4 km1,120 kWh/kWp
- Porokhova4 km1,113 kWh/kWp
All places: Chortkivskyi RaionTernopil Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.