Solar plant: site data

Solar power plant in Romanove Selo, Ternopilskyi Raion, Ternopil Oblast

Romanove Selo: 1,093 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). Exactly the oblast median (1,093). #69 of 313 in the rayon, #358 of 744 in the oblast.

Ternopil, the rayon centre, is 21 km away. 340 m above sea level. 15 km away: Zbarazh, the nearest bigger centre, 1,078 — 1.4% more here. Snow and wind from the nearest regional centre in the DBN — Тернопіль, 21 km. 11.40 m between rows, pitch 15.27 m (latitude 49.5°).

Yield of 1 kWp
1,093kWh/year
Tilt
36°2° east of south
10 kW
10,934kWh/year
Row pitch
15.27m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,390 / 520Pa

Ground frame designer

A ground frame for a solar plant: Romanove Selo

The designer opens with this place’s coordinates, latitude 49.5° for the row spacing and the DBN loads of the nearest regional centre — Тернопіль, 21 km: snow 1,390 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

31Jan51Feb93Mar117Apr131May135Jun139Jul136Aug112Sep83Oct37Nov29Dec

July: 139 kWh/kWp, December: 29 — 4.8 times less.

January: 31 against 34 in the oblast, 8.8% less.

Romanove Selo: plants, kWh
kWpA yearJulyDecember
55,467695145
1010,9341,390290
1516,4012,085435

Snow and wind: Тернопіль

Example: a 10 kW ground frame

For the loads of Ternopil: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Ternopilskyi RaionTernopil Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.