Solar plant: site data
Solar power plant in Ray, Ternopilskyi Raion, Ternopil Oblast
Ray: 1,018 kWh per kWp a year, tilt 34° 20° west of south (PVGIS). 6.8% below the oblast median (1,093). #313 of 313 in the rayon, #742 of 744 in the oblast.
Ternopil, the rayon centre, is 51 km away. 313 m above sea level. 2 km away: Berezhany, the nearest bigger centre, 1,094 — 6.9% less here. Snow and wind from the nearest regional centre in the DBN — Тернопіль, 51 km. 10.75 m between rows, pitch 14.72 m (latitude 49.4°).
- Yield of 1 kWp
- 1,018kWh/year
- Tilt
- 34°20° west of south
- 10 kW
- 10,177kWh/year
- Row pitch
- 14.72m · GCR 0.33
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,390 / 520Pa
Ground frame designer
A ground frame for a solar plant: Ray
The designer opens with this place’s coordinates, latitude 49.4° for the row spacing and the DBN loads of the nearest regional centre — Тернопіль, 51 km: snow 1,390 Pa, wind 520 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 136 kWh/kWp, December: 18 — 7.6 times less.
December: 18 against 30 in the oblast, 40.0% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,089 | 680 | 90 |
| 10 | 10,177 | 1,360 | 180 |
| 15 | 15,266 | 2,040 | 270 |
Example: a 10 kW ground frame
For the loads of Ternopil: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.
How these numbers are computed
Nearby
- Lisnyky2 km1,090 kWh/kWp
- Berezhany2 km1,094 kWh/kWp
- Nadorozhnev4 km1,094 kWh/kWp
- Hayok5 km1,094 kWh/kWp
- Posukhiv5 km1,093 kWh/kWp
- Lapshyn6 km1,096 kWh/kWp
All places: Ternopilskyi RaionTernopil Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.